MaxProtech Power Solutions Limited
Solar PV System Design Report
Date: 11/5/2026
Automated design
Off-grid PV system — 2.5 kWp / 19.2 kWh
Live engineering
Daily PV yield
9.4 kWh
Array × sun hours × 0.75 derate
Solar coverage
117%
Yield ÷ daily demand
DC/AC ratio
0.71
PV kWp ÷ inverter kVA
Usable storage
15.4 kWh
Bank × 80% DoD
Real autonomy
1.8 days
Usable storage ÷ daily load
Battery C-rate
0.20 C
Inverter DC current ÷ bank Ah
Accuracy checks
6/7 passed- Cold string Voc115 V vs 150 V limit
- Hot string Vmp74 V estimated hot vs 57.599999999999994 V MPPT minimum
- Energy balancePV covers 117% of daily demand
- DC/AC ratio0.71 (target 0.8–1.4)
- Battery discharge0.20 C vs 0.5 C recommended
- Cable voltage dropWorst circuit 2.71%
- Battery voltage match4 × 12 V on 48 V bus
Equipment optimizer
Tests every MaxProtech panel, inverter and battery combination against your load and ranks the leanest safe fits.
#1 · 2.50 kWp / 14.4 kWh
4 × RED SOLAR 625W
Solis S6-EH1P3K-L-PLUS (3 kW) · 12 × Maxpower MP 1200 Alpha
#2 · 2.50 kWp / 14.4 kWh
4 × RED SOLAR 625W
Solis S6-EH1P3K-L-PLUS (3 kW) · 6 × Maxpower MP 2500 Alpha
#3 · 2.50 kWp / 14.4 kWh
4 × RED SOLAR 625W
Solis S6-EH1P3K-L-PLUS (3 kW) · 3 × Maxpower MP-5000 Alpha
Single-line diagram
Connection diagram
Equipment schedule
| PV array | 4 × 625 W = 2.50 kWp (2S2P) |
| String Voc / cold Voc | 100.4 V / 115.5 V |
| Integrated solar charging | Built-in MPPT · PV Voc limit 150 V |
| Battery bank | 8 × 12 V 200 Ah → 48 V 400 Ah (19.2 kWh) |
| Hybrid inverter | 3.5 kVA, DC input 79 A · built-in charge control |
Cable & protection schedule
| Circuit | I (A) | Size | Run | Vd | OCPD |
|---|---|---|---|---|---|
| String cable | 19.6 | 6 mm² / 10 AWG | 20 m | 2.71% | 25 A |
| PV → hybrid inverter | 39.1 | 16 mm² / 6 AWG | 20 m | 2.03% | 50 A |
| Battery → hybrid inverter | 79.3 | 25 mm² / 4 AWG | 3 m | 0.69% | 100 A |
| AC output | 15.2 | 2.5 mm² / 14 AWG | 15 m | 1.39% | 20 A |
Ratings use 25% safety margins and a 3% voltage-drop limit. Verify against applicable IEC/NEC standards before installation.